Monografie (a stampa) Monografie (a stampa)
iea

Projected costs of generating electricity from power stations for commissioning in the period 1995-2000

Paris : OECD, c1989
Items: 1
Loans: 0
Reservations: 0
Field Value
Description Projected costs of generating electricity from power stations for commissioning in the period 1995-2000 / Organisation for economic cooperation and development, OECD Nuclear energy agency, International energy agency. - Paris : OECD, c1989. - 206 p.
Numbers
  • ISBN: 92-64-13316-X
Authors
Classificazion
  • 333.7932 - Energia elettrica (Show detail)
Subjects
Language
ID file 4020
Extend the research of the resource
Extend the research of the authors
All copies
Library Inv. Collocation State Status Reservations
Fondazione Eni Enrico Mattei 2492 333.7932.PRO Available In library None